1           GAUSS-JORDAN---DATA 1                                          

 V(I) IS THE VALUE OF THE ITH COMPUTATIONAL STEP.
 D(I) IS THE VALUE OF THE ITH DATA ITEM.
 C(I) IS THE VALUE OF THE ITH CONSTANT.

 PROGRAM TREE
 V(  1) = D(  2)/D(  1)    V( 39) = V( 16)-V( 38)                                                                                  
 V(  2) = V(  1)*D(  5)    V( 40) = V( 35)*V(  9)                                                                                  
 V(  3) = D(  6)-V(  2)    V( 41) = V( 18)-V( 40)                                                                                  
 V(  4) = V(  1)*D(  9)    V( 42) = V( 21)/V(  3)                                                                                  
 V(  5) = D( 10)-V(  4)    V( 43) = V( 42)*V(  5)                                                                                  
 V(  6) = V(  1)*D( 13)    V( 44) = V( 23)-V( 43)                                                                                  
 V(  7) = D( 14)-V(  6)    V( 45) = V( 42)*V(  7)                                                                                  
 V(  8) = V(  1)*D( 17)    V( 46) = V( 25)-V( 45)                                                                                  
 V(  9) = D( 18)-V(  8)    V( 47) = V( 42)*V(  9)                                                                                  
 V( 10) = D(  3)/D(  1)    V( 48) = V( 27)-V( 47)                                                                                  
 V( 11) = V( 10)*D(  5)    V( 49) = V( 30)/V( 37)                                                                                  
 V( 12) = D(  7)-V( 11)    V( 50) = V( 49)*V( 39)                                                                                  
 V( 13) = V( 10)*D(  9)    V( 51) = V( 32)-V( 50)                                                                                  
 V( 14) = D( 11)-V( 13)    V( 52) = V( 49)*V( 41)                                                                                  
 V( 15) = V( 10)*D( 13)    V( 53) = V( 34)-V( 52)                                                                                  
 V( 16) = D( 15)-V( 15)    V( 54) = V(  5)/V( 37)                                                                                  
 V( 17) = V( 10)*D( 17)    V( 55) = V( 54)*V( 39)                                                                                  
 V( 18) = D( 19)-V( 17)    V( 56) = V(  7)-V( 55)                                                                                  
 V( 19) = D(  4)/D(  1)    V( 57) = V( 54)*V( 41)                                                                                  
 V( 20) = V( 19)*D(  5)    V( 58) = V(  9)-V( 57)                                                                                  
 V( 21) = D(  8)-V( 20)    V( 59) = V( 44)/V( 37)                                                                                  
 V( 22) = V( 19)*D(  9)    V( 60) = V( 59)*V( 39)                                                                                  
 V( 23) = D( 12)-V( 22)    V( 61) = V( 46)-V( 60)                                                                                  
 V( 24) = V( 19)*D( 13)    V( 62) = V( 59)*V( 41)                                                                                  
 V( 25) = D( 16)-V( 24)    V( 63) = V( 48)-V( 62)                                                                                  
 V( 26) = V( 19)*D( 17)    V( 64) = V( 51)/V( 61)                                                                                  
 V( 27) = D( 20)-V( 26)    V( 65) = V( 64)*V( 63)                                                                                  
 V( 28) = D(  5)/V(  3)    V( 66) = V( 53)-V( 65)                                                                                  
 V( 29) = V( 28)*V(  5)    V( 67) = V( 56)/V( 61)                                                                                  
 V( 30) = D(  9)-V( 29)    V( 68) = V( 67)*V( 63)                                                                                  
 V( 31) = V( 28)*V(  7)    V( 69) = V( 58)-V( 68)                                                                                  
 V( 32) = D( 13)-V( 31)    V( 70) = V( 39)/V( 61)                                                                                  
 V( 33) = V( 28)*V(  9)    V( 71) = V( 70)*V( 63)                                                                                  
 V( 34) = D( 17)-V( 33)    V( 72) = V( 41)-V( 71)                                                                                  
 V( 35) = V( 12)/V(  3)    V( 73) = V( 66)/D(  1)                                                                                  
 V( 36) = V( 35)*V(  5)    V( 74) = V( 69)/V(  3)                                                                                  
 V( 37) = V( 14)-V( 36)    V( 75) = V( 72)/V( 37)                                                                                  
 V( 38) = V( 35)*V(  7)    V( 76) = V( 63)/V( 61)                                                                                  
1
                       DATA 1                                                 
-DATA
 D( 1) =  2.9080000E+00
 D( 2) =  1.2120000E+00
 D( 3) =  4.5520000E+00
 D( 4) = -5.8090000E+00
 D( 5) = -2.2530000E+00
 D( 6) =  1.9950000E+00
 D( 7) =  5.6810002E+00
 D( 8) = -5.0300002E+00
 D( 9) =  6.7750001E+00
 D(10) =  2.2660000E+00
 D(11) =  8.8500004E+00
 D(12) =  9.8999999E-02
 D(13) =  3.9700000E+00
 D(14) =  8.0080004E+00
 D(15) =  1.3020000E+00
 D(16) =  7.8319998E+00
 D(17) =  6.2909999E+00
 D(18) =  7.2189999E+00
 D(19) =  5.7300000E+00
 D(20) =  9.5740004E+00
-THE EXACT METHOD WILL PERFORM THE ANALYSIS.
-OUTPUT NODE          VALUE            CONDITION OF PROBLEM            CONDITION OF ALGORITHM           RELATIVE ERROR BOUND
     73          -7.2402638E-01           2.4248800E+01                    1.1260422E+05                   1.1262847E+05
     74           1.1067011E-01           5.9899895E+01                    6.4384789E+04                   6.4444688E+04
     75           8.3895272E-01           6.7210698E+00                    2.6737430E+04                   2.6744150E+04
     76           7.4604970E-01           3.9562144E+00                    1.3674008E+01                   1.7630222E+01
-THETA =   8.63958E+03
-STORAGE REQUIRED -
 INTEGER    320
 REAL       684
1
                       DATA 2                                                 
-DATA
 D( 1) =  1.0000000E+00
 D( 2) =  5.0000000E-01
 D( 3) =  2.5000000E-01
 D( 4) =  1.2500000E-01
 D( 5) =  1.0000000E+00
 D( 6) =  2.5000000E-01
 D( 7) =  6.2500000E-02
 D( 8) =  1.5625000E-02
 D( 9) =  1.0000000E+00
 D(10) =  1.2500000E-01
 D(11) =  1.5625000E-02
 D(12) =  1.9531000E-03
 D(13) =  1.0000000E+00
 D(14) =  1.5625000E-02
 D(15) =  3.9062500E-03
 D(16) =  2.4414000E-04
 D(17) =  1.0000000E+01
 D(18) =  1.6250000E+00
 D(19) =  4.3750000E-01
 D(20) =  1.6308594E-01
-THE EXACT METHOD WILL PERFORM THE ANALYSIS.
-OUTPUT NODE          VALUE            CONDITION OF PROBLEM            CONDITION OF ALGORITHM           RELATIVE ERROR BOUND
     73           1.0833366E+00           1.3487244E+01                    3.2611786E+02                   3.3960510E+02
     74           9.1664791E-01           1.3376102E+02                    2.5146294E+03                   2.6483904E+03
     75           6.6666923E+00           3.3733334E+01                    5.5235242E+02                   5.8608575E+02
     76           1.3333230E+00           1.0314391E+02                    1.2769189E+03                   1.3800629E+03
-THETA =   3.30932E+01
-STORAGE REQUIRED -
 INTEGER    320
 REAL       684
1
                       DATA 3                                                 
-DATA
 D( 1) =  6.0000000E+00
 D( 2) =  4.0000000E+00
 D( 3) =  4.0000000E+00
 D( 4) =  1.0000000E+00
 D( 5) =  4.0000000E+00
 D( 6) =  6.0000000E+00
 D( 7) =  1.0000000E+00
 D( 8) =  4.0000000E+00
 D( 9) =  4.0000000E+00
 D(10) =  1.0000000E+00
 D(11) =  6.0000000E+00
 D(12) =  4.0000000E+00
 D(13) =  1.0000000E+00
 D(14) =  4.0000000E+00
 D(15) =  4.0000000E+00
 D(16) =  6.0000000E+00
 D(17) =  3.0000000E+01
 D(18) =  3.5000000E+01
 D(19) =  4.0000000E+01
 D(20) =  4.5000000E+01
-THE EXACT METHOD WILL PERFORM THE ANALYSIS.
-OUTPUT NODE          VALUE            CONDITION OF PROBLEM            CONDITION OF ALGORITHM           RELATIVE ERROR BOUND
     73           1.0000013E+00           7.7999924E+01                    2.5911084E+02                   3.3711078E+02
     74           1.9999993E+00           3.8000015E+01                    1.0344449E+02                   1.4144450E+02
     75           2.9999995E+00           2.4666674E+01                    5.4518539E+01                   7.9185211E+01
     76           4.0000005E+00           1.7999998E+01                    2.8777775E+01                   4.6777771E+01
-THETA =   8.40000E+00
-STORAGE REQUIRED -
 INTEGER    320
 REAL       684
1
                       DATA 4                                                 
-DATA
 D( 1) =  4.0000000E+00
 D( 2) =  2.0000000E+00
 D( 3) =  1.0000000E+00
 D( 4) =  3.0000000E+00
 D( 5) =  1.0000000E+00
 D( 6) = -5.0000000E+00
 D( 7) =  2.0000000E+00
 D( 8) =  1.0000000E+00
 D( 9) =  1.0000000E+00
 D(10) =  1.0000000E+00
 D(11) =  6.0000000E+00
 D(12) =  2.0000000E+00
 D(13) =  1.0000000E+00
 D(14) =  1.0000000E+00
 D(15) =  1.0000000E+00
 D(16) = -7.0000000E+00
 D(17) =  1.3000000E+01
 D(18) = -1.0000000E+00
 D(19) =  2.7000000E+01
 D(20) = -1.7000000E+01
-THE EXACT METHOD WILL PERFORM THE ANALYSIS.
-OUTPUT NODE          VALUE            CONDITION OF PROBLEM            CONDITION OF ALGORITHM           RELATIVE ERROR BOUND
     73           9.9999994E-01           1.0945633E+01                    2.7291683E+01                   3.8237316E+01
     74           2.0000000E+00           3.6970873E+00                    8.6878910E+00                   1.2384978E+01
     75           2.9999998E+00           4.4045310E+00                    1.0143831E+01                   1.4548363E+01
     76           4.0000005E+00           2.7101943E+00                    8.5745354E+00                   1.1284730E+01
-THETA =   3.31318E+00
-STORAGE REQUIRED -
 INTEGER    320
 REAL       684
1
                       DATA 5                                                 
-DATA
 D( 1) =  1.0000000E+01
 D( 2) =  3.0000000E+00
 D( 3) =  2.0000000E+00
 D( 4) =  1.0000000E+00
 D( 5) =  3.0000000E+00
 D( 6) =  1.1000000E+01
 D( 7) =  3.0000000E+00
 D( 8) =  2.0000000E+00
 D( 9) =  2.0000000E+00
 D(10) =  3.0000000E+00
 D(11) =  1.2000000E+01
 D(12) =  3.0000000E+00
 D(13) =  1.0000000E+00
 D(14) =  2.0000000E+00
 D(15) =  3.0000000E+00
 D(16) =  1.3000000E+01
 D(17) =  2.6000000E+01
 D(18) =  4.2000000E+01
 D(19) =  5.6000000E+01
 D(20) =  6.6000000E+01
-THE EXACT METHOD WILL PERFORM THE ANALYSIS.
-OUTPUT NODE          VALUE            CONDITION OF PROBLEM            CONDITION OF ALGORITHM           RELATIVE ERROR BOUND
     73           1.0000000E+00           9.4869356E+00                    1.3861727E+01                   2.3348663E+01
     74           2.0000000E+00           6.8414488E+00                    1.3155573E+01                   1.9997021E+01
     75           2.9999998E+00           5.0609660E+00                    1.2096899E+01                   1.7157866E+01
     76           4.0000005E+00           3.4575415E+00                    9.8951950E+00                   1.3352736E+01
-THETA =   2.41037E+00
-STORAGE REQUIRED -
 INTEGER    320
 REAL       684
1
                                                                              
