
  The contingency table for this problem is:
     22.    13.     5.     4.     5.     3.     2.     1.
      7.     1.     4.     3.     1.     2.     3.     4.
  PRT =0.000001 PRE = 0.035954

  The contingency table for this problem is:
     20.     3.     6.     4.     7.     6.     6.     2.     2.     2.
      8.     8.     4.     5.     2.     1.     0.     2.     1.     1.
  PRT =0.000000 PRE = 0.082538

  The contingency table for this problem is:
     24.     7.     3.     8.     1.
      9.     5.     5.     0.     3.
      2.     0.     2.     0.     1.
  PRT =0.000001 PRE = 0.019930

  The contingency table for this problem is:
      1.     8.     5.     4.     4.     2.     2.
      5.     3.     3.     4.     3.     1.     0.
     10.     1.     4.     0.     0.     0.     0.
  PRT =0.000000 PRE = 0.003560

  The contingency table for this problem is:
      9.     1.     3.     1.     3.
      3.     3.     2.     1.     3.
      8.     2.     4.     2.     0.
      4.     9.     2.     0.     0.
  PRT =0.000000 PRE = 0.025131

  The contingency table for this problem is:
      2.     3.     4.     8.     9.
      0.     0.    11.    10.    11.
  PRT =0.000453 PRE = 0.085524

  The contingency table for this problem is:
      2.     4.     6.
      7.     6.     1.
      5.     0.     0.
  PRT =0.000065 PRE = 0.007609

  The contingency table for this problem is:
      2.     0.     1.     2.     6.     5.
      1.     3.     1.     1.     1.     2.
      1.     0.     3.     1.     0.     0.
      1.     2.     1.     2.     0.     0.
  PRT =0.000000 PRE = 0.045374

  The contingency table for this problem is:
      1.     2.     2.     1.     1.     0.
      2.     0.     0.     2.     3.     0.
      0.     1.     1.     1.     2.     7.
      1.     1.     2.     0.     0.     0.
      0.     1.     1.     1.     1.     0.
  PRT =0.000000 PRE = 0.025839

  The contingency table for this problem is:
      1.     1.     1.     0.     0.     0.     1.     2.     4.
      4.     4.     4.     5.     5.     5.     6.     5.     0.
      1.     1.     1.     0.     0.     0.     1.     2.     4.
  PRT =0.000000 PRE = 0.035352

  The contingency table for this problem is:
     20.    20.     2.     2.     0.     0.     0.     1.
     10.    10.     1.     1.     3.     3.     1.     0.
     20.    20.     2.     2.     0.     0.     0.     1.
  PRT =0.000000 PRE = 0.125371

  The contingency table for this problem is:
     12.     6.    12.     1.     1.     0.
      5.    12.     4.     4.     0.     1.
      5.    12.    10.     1.     1.     0.
  PRT =0.000000 PRE = 0.049480
